| Scafolding prior to work being carried out. | Vertical tiles removed on gable and front. | Gable showing insulation and studding. | Gable showing breathable waterproof membrane. |
|---|---|---|---|
|
|
|
|
Gable and front elevation ready for cladding. | Front elevation finished showing vertical tiles next door. | As before from differnt angle. | Veiw of gable showing. |
|
|
|
|
| Rear elevation again showing tiles next door. | Again from the rear showing Dry verge system to roof tiles. |
|---|---|
|
|